Change of Order of Integration Calculator
Type the limits of a double integral, innermost first, to reverse their order.
The limits of a region as they are now, innermost first: y between two curves in x, then x between two numbers.
Result
You entered
Show the work
The region as it is given
The limits describe the region , : for each the variable runs between two curves.
Boundary curves solved for the other variable
To reverse the order, solve each boundary curve for in terms of .
Limits of the outer variable
now runs over the whole height of the region, from its lowest point to its highest.
Limits of the inner variable
For each , runs from the larger of the left-hand boundaries to the smaller of the right-hand ones, and one pair applies for the whole height.
Check by area
The area of the region is the same in both orders (0.5), so the limits describe the same region.
Result
The limits with the order reversed, innermost first.